THE COMPLETE TOOLKIT

Measure. Estimate. Build.

26 focused tools. One less thing to calculate by hand.

All calculators

▱↗

Concrete Volume

Slabs, bases and pours. Get the volume right.

Concrete Structures
▱↗

Concrete Cost

Turn your concrete quantity into a material budget.

Concrete Structures
▱↗

Concrete Column

Round or rectangular columns, by the pour.

Concrete Structures
▱↗

Concrete Beam

Concrete and three-sided formwork for beams.

Concrete Structures
▱↗

Concrete Wall

Wall volume and formwork on both faces.

Concrete Structures
▱↗

Concrete Slab

Concrete, bag counts and mesh coverage.

Concrete Structures
▱↗

Concrete Stairs

A solid stepped block, measured tread by tread.

Concrete Structures
⌑↗

Strip Footing

Continuous footing volume and longitudinal bars.

Foundations
⌑↗

Pad / Spread Footing

Quantities for one pad or a repeated foundation.

Foundations
⌑↗

Pile Cap

Rectangular pile-cap concrete and steel allowance.

Foundations
╬↗

Rebar Weight

Convert bar diameter and total length into kilograms.

Reinforcement
╬↗

Rebar Quantity

Bar counts, total weight and a material allowance.

Reinforcement
╬↗

Rebar Lap Length

Explore a stated lap-length assumption.

Reinforcement
▦↗

Brickwork

Masonry units and a geometric mortar allowance.

Masonry & Finishes
▦↗

Blockwork

Masonry units and a geometric mortar allowance.

Masonry & Finishes
▦↗

Plastering / Render

From coverage and thickness to mix and bags.

Masonry & Finishes
▦↗

Screed

From coverage and thickness to mix and bags.

Masonry & Finishes
▦↗

Paint Coverage

Paint quantities, coats and whole cans.

Masonry & Finishes
▦↗

Tile & Grout

Tile counts and joint-fill volume.

Masonry & Finishes
◩↗

Excavation Volume

Dig volume, loose spoil and truckloads.

Earthworks
◩↗

Backfill

The void left after the structure is in place.

Earthworks
⊞↗

Timber Stud

A straight wall’s basic stud count.

Timber / Framing
⊞↗

Timber Volume / Cost

Member volumes, board feet and material cost.

Timber / Framing
↗↗

Cost Per m² / Sq Ft

Benchmark a project, or build a budget from a rate.

General Cost Estimation
↗↗

Labour Cost

Hours, crew size and the cost of labour.

General Cost Estimation
↗↗

Markup / Margin

Price a job without mixing up markup and margin.

General Cost Estimation