How to approach concrete structures quantities
Concrete takeoffs separate net geometric volume in cubic metres from ordering allowances, bag yields and temporary formwork contact areas. Measure each structural element once so slab, beam and column intersections are never double-counted.
TAKEOFF CHECKLIST
- Keep net geometric volume separate from wastage and pump or minimum-load allowances.
- Verify whether formwork includes soffits, sides, end stops or opening deductions.
- Check product bag yields in cubic metres per bag against the supplier datasheet.
- Confirm concrete strength class and exposure designation on the structural drawings.
▱↗
Concrete Volume
Slabs, bases and pours. Get the volume right.
Concrete Structures▱↗
Concrete Cost
Turn your concrete quantity into a material budget.
Concrete Structures▱↗
Concrete Column
Round or rectangular columns, by the pour.
Concrete Structures▱↗
Concrete Beam
Concrete and three-sided formwork for beams.
Concrete Structures▱↗
Concrete Wall
Wall volume and formwork on both faces.
Concrete Structures▱↗
Concrete Slab
Concrete, bag counts and mesh coverage.
Concrete Structures▱↗
Concrete Stairs
A solid stepped block, measured tread by tread.
Concrete Structures